The following steps are required for new service. 
- Effective June 1, 2022, a completed application is required, along with a $25.00 non-refundable application fee.
- Once the application is submitted, a member service representative will contact you to verify your information. You will be provided with an account number to pay the $25.00 application fee.
- Payments can be made through Cloverland’s secure one-time payment link or by calling our automated payment line at 1-855-947-3203.
- Applications will be forwarded to our engineering department once payment has been received.
- Applications are processed in the order in which they are received. Please allow five to seven business days for contact.
- Application fees not paid within 180 days will result in a canceled application.
New or Upgraded Service Application PDF (download and print)
Checklist
- Complete and return the application and include a sketch of your building site. Show all existing and proposed underground facilities such as water lines, septic tanks, drain fields, along with phone, electric, gas, and cable TV lines.
- Once the application is submitted, a member service representative will contact you to verify your information. You will be provided with an account number to pay the $25.00 application fee.
- Payments can be made through Cloverland’s secure one-time payment link or by calling our automated payment line at 1-855-947-3203.
- Applications will be forwarded to our engineering department once payment has been received.
- Applications are processed in the order in which they are received. Please allow five to seven business days for contact.
- Application fees not paid within 180 days will result in a canceled application.
New or Upgraded Service Application PDF
- Complete and return the service application by visiting the Request New or Upgraded Commercial Service form and include a sketch of your building site. Show all existing and proposed underground facilities such as water lines, septic tanks, drain fields, along with phone, electric, gas, and cable TV lines.
- Once the application is submitted, a member service representative will contact you to verify your information. You will be provided with an account number to pay the $25.00 application fee.
- Payments can be made through Cloverland’s secure one-time payment link or by calling our automated payment line at 1-855-947-3203.
- Applications will be forwarded to our engineering department once payment has been received.
- Applications are processed in the order in which they are received. Please allow five to seven business days for contact.
- Application fees not paid within 180 days will result in a canceled application.
The service route from the transformer to the service location must be cleared per Cloverland specifications.
An on-site evaluation and written price estimate are available upon request for a small fee.
Construction fees must be paid in full before we will proceed with the construction of your service. Cost estimates for the work performed will be based on rough grade restoration.
An electrical permit is required. If you will be doing the work yourself, you must apply for the permit. If you are planning to hire an electrical contractor, the contractor will apply for the permit. Permit applications may take two or more weeks for processing. View the Michigan Electrical Permit Application (PDF).
Before we can make the service connection, the meter socket, disconnect panel, and related items must be installed per Cloverland specifications and applicable electrical codes.
For primary metering, please review our distributed primary voltage service requirements (PDF).
We require a signed easement before the service is installed. Easements may also be required from adjoining property owner(s). This process can take a number of months.
An electrical inspector must approve the service. If you are completing the work yourself, it is up to you to schedule the inspection; otherwise, the electrical contractor will do it for you. Once your service is approved, the electrical inspector will notify our member services department and provide us with an official release.
Before contacting an electrical inspector, contact your local Cloverland Staking Technician by calling (906) 635-6800.
All new service applicants will be required to pay a one-time $5 co-op membership fee and any other applicable construction fees as approved by the Michigan Public Service Commission. For details, please refer to the Construction Policy in the applicable rates and rules provided on our Rates and Charges page.
November 14-April 30: Winter charges may apply if ground conditions permit installation at all. Additional charges for road crossing permits, DNRE permits, conduit, and cabinets may apply if required for the installation.