The following steps are required for new service. Once these steps are complete, you can anticipate Cloverland crews beginning construction of your service. Please be aware that inclement weather, power outages and customer-requested design changes can cause delays.

  • Effective June 1, 2022, a completed application is required along with a $25.00 non-refundable application fee.
  • Once application is submitted, an invoice will be emailed to you within three business days.
  • Applications will be processed once an invoice has been generated and payment is received.
  • Payments can be made by through the link on the invoice or by calling our automated payment line at: 1-844-843-6837.
  • Once payment is received, a member service representative will contact you to confirm and verify your information.
Residential Service Application Commercial Service Application

Checklist

  • Complete and return the application and include a sketch of your building site. Show all existing and proposed underground facilities such as water lines, septic tanks, drain fields, along with phone, electric, gas, and cable TV lines.
  • Effective June 1, 2022, a completed application is required along with a $25.00 non-refundable application fee.
  • Once your application is submitted, an invoice will be emailed to you within three business days.
  • Applications will be processed once an invoice has been generated and payment is received.
  • Payments can be made by through the link on the invoice or by calling our automated payment line at: 1-844-843-6837.
  • Once payment is received, a member service representative will contact you to confirm and verify your information.
Residential New or Upgraded Service Application

Residential New or Upgraded Service Application PDF

 

  • Complete and return the service application by visiting the Request New or Upgraded Commercial Service form and include a sketch of your building site. Show all existing and proposed underground facilities such as water lines, septic tanks, drain fields, along with phone, electric, gas, and cable TV lines.
  • Effective June 1, 2022, a completed application is required along with a $25.00 non-refundable application fee.
  • Once application is submitted, an invoice will be emailed to you within three business days.
  • Applications will be processed once an invoice has been generated and payment is received.
  • Payments can be made through the link on the invoice or by calling our automated payment line at: 1-844-843-6837.
  • Once payment is received, an member service representative will contact you to confirm and verify your information.
New or Upgraded Commercial Service Application

New or Upgraded Commercial Service Application PDF

The service route from the transformer to the service location must be cleared per Cloverland specifications.

An on-site evaluation and written price estimate are available upon request for a small fee. Members may submit their requests online using the Residential Service Application or Commercial Service Application.

Construction fees must be paid in full before we will proceed with the construction of your service. Cost estimates for the work performed will be based on rough grade restoration.

An electrical permit is required. If you will be doing the work yourself, you must apply for the permit. If you are planning to hire an electrical contractor, the contractor will apply for the permit. Permit applications may take two or more weeks for processing. View the Michigan Electrical Permit Application (PDF).

Before we can make the service connection, the meter socket, disconnect panel, and related items must be installed per Cloverland specifications and applicable electrical codes.

For primary metering, please review our distributed primary voltage service requirements (PDF).

We require a signed easement before the service is installed. Easements may also be required from adjoining property owner(s). This process can take a number of months.

An electrical inspector must approve the service. If you are completing the work yourself, it is up to you to schedule the inspection; otherwise, the electrical contractor will do it for you. Once your service is approved, the electrical inspector will notify our member services department and provide us with an official release.

Before contacting an electrical inspector, contact your local Cloverland Staking Technician for your area by calling (906) 635-6800.

All new service applicants will be required to pay a one-time $5 co-op membership fee and any other applicable construction fees as approved by the Michigan Public Service Commission. For details, please refer to the Construction Policy in the applicable rates and rules provided on our Rates and Charges page.

November 14-April 30: Winter charges may apply if ground conditions permit installation at all. Additional charges for road crossing permits, DNRE permits, conduit, and cabinets may apply if required for the installation.